COUNTY ROAD 99W over BUCKEYE CREEK
0.5 MI SE OF CO LINE RD · County 113, California · Built 2018 · 2 Lanes · 2,000 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
38.919317, -121.992197
This bridge is in worse condition than 9.9% of bridges in County 113. The average bridge in California is 0 years old; this one is 8 years old.
Nearby Bridges
INTERSTATE 5 over BUCKEYE CREEK
Built 1968
INTERSTATE 5 over BUCKEYE CREEK
Built 1968
COUNTY ROAD 2 over INTERSTATE 5
Built 1968
COUNTY LINE ROAD over INTERSTATE 5
Built 1968
COUNTY ROAD 2 over TEHAMA-COLUSA CANAL
Built 1978
YOLO-COLUSA CO. RD over TEHAMA-COLUSA CANAL
Built 1978
COUNTY ROAD 89 over BUCKEYE CREEK
Built 2014
COUNTY ROAD 4 over INTERSTATE 5
Built 1968
INTERSTATE 5 over FARM LAND DRAIN
Built 1968
COUNTY ROAD 88 over S FORK DUNNIGAN CREEK
Built 1985
Bridge Details
- Structure #
- 22C0185
- Year Built
- 2018
- Length
- 37.3 m (122.4 ft)
- Max Span
- 36.5 m
- Width
- 10.6 m (34.8 ft)
- Lanes
- 2
- Daily Traffic
- 2,000
- Material
- Prestressed Concrete
- Design
- Box Beam or Girders - Multiple
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.