NB JEFFERSON BLVD over DEEP WATER CANAL
0.2 MI SOUTH OF STONE ST · County 113, California · Built 1960 · 2 Lanes · 17,439 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
4
Poor
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 4 | Poor |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
38.5611, -121.528556
This bridge is in worse condition than 95.6% of bridges in County 113. The average bridge in California is 0 years old; this one is 66 years old.
Nearby Bridges
SB JEFFERSON BLVD over DEEP WATER CANAL
Built 2005
SOUTH RIVER ROAD over SACRAMENTO BARGE CANAL
Built 2015
INDUSTRIAL BLVD over DEEP WATER CANAL & RR
Built 1997
US 50-RAMP A13-WB over I-5 C12 A4 BROADWAY
Built 1971
US 50-RAMP A4-EB over I-5 A13 C12 FRONT ST
Built 1971
US 50 (I-305) WB over SACRAMENTO RIV I-5 CONNS
Built 1966
US 50 (I-305) EB over SACRAMENTO RIV I 5 CONNS
Built 1966
US 50-RAMP A25-EB over RAMP A13 BROADWAY
Built 1971
US 50-RAMP A17-WB over I-5 VAR RAMPS VAR ST
Built 1971
US 50-RAMP G8-EB
Built 1966
Bridge Details
- Structure #
- 22C0168R
- Year Built
- 1960
- Reconstructed
- 2005
- Length
- 53.6 m (175.9 ft)
- Max Span
- 38.6 m
- Width
- 15.9 m (52.2 ft)
- Lanes
- 2
- Daily Traffic
- 17,439
- Material
- Steel
- Design
- Truss - Thru
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $756,000
- Total Project Cost
- $1,434,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.