COUNTY ROAD 12 over WILLOW SPRING CREEK
0.04 MI WEST OF CR #94 · County 113, California · Built 1940 · 2 Lanes · 160 vehicles/day
Overall
Deck
5
Fair
Superstructure
5
Fair
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 5 | Fair |
| Substructure | 7 | Good |
Location
38.808775, -121.878072
This bridge is in worse condition than 65% of bridges in County 113. The average bridge in California is 0 years old; this one is 86 years old.
Nearby Bridges
COUNTY ROAD 12 over INTERSTATE 5
Built 1970
COUNTY ROAD 99W over WILLOW SPRING CREEK
Built 1949
COUNTY RD 13 (E10) over INTERSTATE 5
Built 1970
COUNTY ROAD 99W over ZAMORA DITCH
Built 1920
COUNTY ROAD 94 over WILLOW SPRING CREEK
Built 1970
INTERSTATE 5 over WILLOW SPRING CREEK
Built 1970
INTERSTATE 5 over ZAMORA CREEK
Built 1970
COUNTY ROAD 12 over ZAMORA CREEK
Built 2016
COUNTY ROAD 99W over SMITH CREEK
Built 1916
INTERSTATE 5 over SMITH CREEK
Built 1970
Bridge Details
- Structure #
- 22C0131
- Year Built
- 1940
- Length
- 7.9 m (25.9 ft)
- Max Span
- 2.4 m
- Width
- 6.7 m (22 ft)
- Lanes
- 2
- Daily Traffic
- 160
- Material
- Concrete Continuous
- Design
- Slab
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.