COUNTY ROAD 96 over UNION SCHOOL SLOUGH

1.38 MI S OF C.R. #27 · County 113, California · Built 1930 · 2 Lanes · 200 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
22C0126
Year Built
1930
Length
12.2 m (40 ft)
Max Span
11.3 m
Width
7.1 m (23.3 ft)
Lanes
2
Daily Traffic
200
Material
Concrete
Design
Tee Beam
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.