INTERSTATE 5 over BRANCH BRETONA CREEK

03-YOL-005-R21.07 · County 113, California · Built 1968 · 4 Lanes · 22,400 vehicles/day

Overall
Fair
Culvert
6
Satisfactory

Bridge Details

Structure #
22 0170
Year Built
1968
Length
7.9 m (25.9 ft)
Max Span
2.4 m
Lanes
4
Daily Traffic
22,400
Material
Concrete Continuous
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.