STATE ROUTE 128 over INTERSTATE 505

03-YOL-128-9.81 · County 113, California · Built 1959 · 2 Lanes · 12,000 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
22 0110
Year Built
1959
Length
84.3 m (276.6 ft)
Max Span
29.1 m
Width
11.2 m (36.7 ft)
Lanes
2
Daily Traffic
12,000
Material
Concrete Continuous
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.