SOSCOL AVE over NAPA RIVER BYPASS

BTWN FIRST AND PEARL STR · County 055, California · Built 2004 · 4 Lanes · 18,241 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
21C0126
Year Built
2004
Length
102.1 m (335 ft)
Max Span
42.4 m
Width
31.7 m (104 ft)
Lanes
4
Daily Traffic
18,241
Material
Prestressed Concrete Continuous
Design
Box Beam or Girders - Multiple
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.