POPE CANYON RD over YOKEL CREEK

S POPE VALLY CROSS RD · County 055, California · Built 1989 · 2 Lanes · 1,370 vehicles/day

Overall
Fair
Culvert
6
Satisfactory

Bridge Details

Structure #
21C0106
Year Built
1989
Length
6.4 m (21 ft)
Max Span
2.1 m
Width
10.4 m (34.1 ft)
Lanes
2
Daily Traffic
1,370
Material
Steel
Design
Culvert
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.