SILVERADO TRAIL over NAPA RIVER OVERFLOW

0.1 MILES N OF HARDMAN RD · County 055, California · Built 1930 · 2 Lanes · 5,450 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
21C0015
Year Built
1930
Reconstructed
1958
Length
17.8 m (58.4 ft)
Max Span
4.3 m
Width
12.5 m (41 ft)
Lanes
2
Daily Traffic
5,450
Material
Concrete Continuous
Design
Tee Beam
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.