STATE ROUTE 121 over HUICHICA CREEK

04-NAP-121-0.75 · County 055, California · Built 2022 · 2 Lanes · 27,300 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
21 0118
Year Built
2022
Length
14 m (45.9 ft)
Max Span
12.9 m
Width
13.4 m (44 ft)
Lanes
2
Daily Traffic
27,300
Material
Prestressed Concrete
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.