STATE ROUTE 128 over CAPELL CREEK

04-NAP-128-20.23 · County 055, California · Built 2021 · 2 Lanes · 3,500 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
21 0116
Year Built
2021
Length
74.4 m (244.1 ft)
Max Span
28.9 m
Width
14.4 m (47.2 ft)
Lanes
2
Daily Traffic
3,500
Material
Prestressed Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.