STATE ROUTE 128 over CONN CREEK

04-NAP-128-R7.41 · County 055, California · Built 2020 · 3 Lanes · 3,300 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
21 0115
Year Built
2020
Length
41.1 m (134.8 ft)
Max Span
19.7 m
Width
20.4 m (66.9 ft)
Lanes
3
Daily Traffic
3,300
Material
Prestressed Concrete Continuous
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.