STATE ROUTE 29 NB over CFNR & PAOLI LOOP ROAD
04-NAP-029-R2.37 · County 055, California · Built 1979 · 2 Lanes · 22,625 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
38.189228, -122.255308
This bridge is in worse condition than 16.3% of bridges in County 055. The average bridge in California is 0 years old; this one is 47 years old.
Nearby Bridges
STATE ROUTE 29 SB over CFNR & PAOLI LOOP ROAD
Built 1979
DEVLIN ROAD over NV RR
Built 2012
AMERICAN CANYON RD over AMERICAN CANYON CREEK
Built 1940
DEVLIN ROAD over FAGAN CREEK
Built 2019
BROADWAY over AMERICAN CANYON CREEK
Built 1973
STATE ROUTE 29 over AMERICAN CANYON CREEK
Built 1943
AIRPORT RD over FAGAN CREEK
Built 1930
W37-N&S29 CONNECTR over BROADWAY UP RR
Built 2005
STATE ROUTE 37 over MINI DRIVE
Built 2005
STATE ROUTE 37 over BROADWAY UP RR
Built 2005
Bridge Details
- Structure #
- 21 0043R
- Year Built
- 1979
- Length
- 65.2 m (213.9 ft)
- Max Span
- 23.5 m
- Width
- 12.7 m (41.7 ft)
- Lanes
- 2
- Daily Traffic
- 22,625
- Material
- Concrete Continuous
- Design
- Box Beam or Girders - Multiple
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.