STATE ROUTE 29 over GARNETT CREEK

04-NAP-029-39.08 · County 055, California · Built 1902 · 2 Lanes · 12,000 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Superstructure
5
Fair
Substructure
4
Poor

Bridge Details

Structure #
21 0005
Year Built
1902
Reconstructed
1955
Length
23.1 m (75.8 ft)
Max Span
8.8 m
Width
6.9 m (22.6 ft)
Lanes
2
Daily Traffic
12,000
Material
Masonry
Design
Arch - Deck
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$407,000
Total Project Cost
$683,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.