APACHE STREET over PAULIN CREEK

0.1 MI N OF STEELE LANE · County 097, California · Built 1964 · 2 Lanes · 2,000 vehicles/day

Overall
Fair
Culvert
6
Satisfactory

Bridge Details

Structure #
20C0556
Year Built
1964
Length
7.5 m (24.6 ft)
Max Span
3.6 m
Lanes
2
Daily Traffic
2,000
Material
Steel
Design
Culvert
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.