RIVER ROAD over HILLSIDE

1.7 MI WEST OF MIRABEL RD · County 097, California · Built 2003 · 2 Lanes · 13,450 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
20C0536
Year Built
2003
Length
23.8 m (78.1 ft)
Max Span
8.2 m
Width
4.3 m (14.1 ft)
Lanes
2
Daily Traffic
13,450
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.