CLOVERDALE BLVD over CLOVERDALE CREEK

0.8 MI. N OF 1ST ST · County 097, California · Built 2000 · 3 Lanes · 5,700 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
7
Good

Bridge Details

Structure #
20C0512
Year Built
2000
Length
13 m (42.7 ft)
Max Span
13 m
Width
19.2 m (63 ft)
Lanes
3
Daily Traffic
5,700
Material
Concrete
Design
Slab
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.