PINE FLAT RD over SAUSAL CREEK
0.63 MI NE OF SR 128 · County 097, California · Built 1974 · 2 Lanes · 100 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
5
Fair
Superstructure
5
Fair
Substructure
4
Poor
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 5 | Fair |
| Substructure | 4 | Poor |
Location
38.678053, -122.805172
This bridge is in worse condition than 95.1% of bridges in County 097. The average bridge in California is 0 years old; this one is 52 years old.
Nearby Bridges
STATE ROUTE 128 over GIRD CREEK
Built 1983
GEYSERS RD over GIRD CREEK
Built 1960
ALEXANDER VALLEY R over RUSSIAN RIVER - JIMTOWN
Built 1949
W SODA ROCK LANE over HILLSIDE
Built 1968
STATE ROUTE 128 over SAUSAL CREEK
Built 1984
IRR BIA ROUTE 93 over RUSSIAN RIVER TRIBUTARY
Built 2010
US HIGHWAY 101 NB over LYTTON SPRINGS ROAD
Built 1974
US HIGHWAY 101 SB over LYTTON SPRINGS ROAD
Built 1974
US HIGHWAY 101 NB over SOUVERAIN RD
Built 1974
US HIGHWAY 101 SB over SOUVERAIN RD
Built 1974
Bridge Details
- Structure #
- 20C0413
- Year Built
- 1974
- Length
- 31.4 m (103 ft)
- Max Span
- 12.2 m
- Width
- 10 m (32.8 ft)
- Lanes
- 2
- Daily Traffic
- 100
- Material
- Concrete Continuous
- Design
- Slab
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $314,000
- Total Project Cost
- $527,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.