FIR ROAD over DUTCH BILL CREEK
MONTE RIO · County 097, California · Built 1974 · 2 Lanes · 300 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
4
Poor
Superstructure
6
Satisfactory
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 4 | Poor |
| Superstructure | 6 | Satisfactory |
| Substructure | 5 | Fair |
Location
38.463283, -123.009847
This bridge is in worse condition than 95.1% of bridges in County 097. The average bridge in California is 0 years old; this one is 52 years old.
Nearby Bridges
MIDDLE TERRACE over HILLSIDE
Built 1980
MAIN ST over DUTCH BILL CREEK
Built 1953
MONTE VISTA TER over HILLSIDE
Built 1960
BOHEMIAN HWY over RUSSIAN RIVER
Built 1934
MONTE VISTA TERRAC over HILLSIDE
Built 2008
MONTE RIO AVE over HILLSIDE
Built 1983
STARRETT HILL DR over HILLSIDE
Built 2015
MOSCOW RD over HILLSIDE
Built 1956
HIGHLAND TERRACE over HILLSIDE
Built 1983
STARRETT HILL DR over HILLSIDE
Built 1988
Bridge Details
- Structure #
- 20C0393
- Year Built
- 1974
- Length
- 29.9 m (98.1 ft)
- Max Span
- 5.8 m
- Width
- 6.7 m (22 ft)
- Lanes
- 2
- Daily Traffic
- 300
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $199,000
- Total Project Cost
- $334,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.