ARNOLD DR over SONOMA CREEK

7.8 MI N OF SR 116 · County 097, California · Built 1924 · 2 Lanes · 13,900 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
4
Poor
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
20C0214
Year Built
1924
Reconstructed
1971
Length
39.6 m (129.9 ft)
Max Span
21.9 m
Width
12.8 m (42 ft)
Lanes
2
Daily Traffic
13,900
Material
Concrete Continuous
Design
Tee Beam
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$444,000
Total Project Cost
$745,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.