STONY POINT RD over WILLOW BROOK CREEK

0.5 MI N INTX PETLMA BL · County 097, California · Built 1961 · 2 Lanes · 10,855 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
20C0118
Year Built
1961
Length
22 m (72.2 ft)
Max Span
8.6 m
Width
12.2 m (40 ft)
Lanes
2
Daily Traffic
10,855
Material
Concrete Continuous
Design
Slab
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.