LINCOLN BLVD over COON CREEK OVERFLOW

0.35 MI NW OF CHAMBERLAIN · County 061, California · Built 1975 · 2 Lanes · 16,800 vehicles/day

Overall
Good
Culvert
7
Good

Bridge Details

Structure #
19C0263
Year Built
1975
Length
7.9 m (25.9 ft)
Max Span
2.4 m
Width
12.7 m (41.7 ft)
Lanes
2
Daily Traffic
16,800
Material
Concrete Continuous
Design
Culvert
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.