BRENTFORD CIRCLE over INGRAM SLOUGH

NEAR ALBERTON CIRCLE · County 061, California · Built 2005 · 2 Lanes · 2,200 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
7
Good

Bridge Details

Structure #
19C0226
Year Built
2005
Length
29 m (95.1 ft)
Max Span
11.6 m
Width
16.7 m (54.8 ft)
Lanes
2
Daily Traffic
2,200
Material
Concrete Continuous
Design
Slab
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.