BELL ROAD over SOUTH FORK DRY CREEK
2.0 MI S OF LOAN STAR RD · County 061, California · Built 2005 · 2 Lanes · 660 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
38.971439, -121.135525
This bridge is in worse condition than 7.2% of bridges in County 061. The average bridge in California is 0 years old; this one is 21 years old.
Nearby Bridges
BELL ROAD over ORR CREEK
Built 2005
JOERGER ROAD over ROCK CREEK
Built 1977
STATE ROUTE 49 over NORTH FORK DRY CREEK
Built 1993
STATE ROUTE 49 over SOUTH FORK DRY CREEK
Built 1993
DRY CREEK RD over ROCK CREEK
Built 1970
STATE ROUTE 49 over ROCK CREEK
Built 1979
BELL ROAD over WISE CANAL
Built 1975
STATE ROUTE 49 over BEAR RIVER
Built 1961
DRY CREEK RD over SOUTH FORK DRY CREEK
Built 1966
NEW AIRPORT RD over WISE CANAL
Built 1930
Bridge Details
- Structure #
- 19C0216
- Year Built
- 2005
- Length
- 17 m (55.8 ft)
- Max Span
- 16.5 m
- Width
- 9.9 m (32.5 ft)
- Lanes
- 2
- Daily Traffic
- 660
- Material
- Prestressed Concrete
- Design
- Slab
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.