STATE ROUTE 65 SB over PLEASANT GROVE CREEK

03-PLA-065-R8.76 · County 061, California · Built 1971 · 2 Lanes · 35,000 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
7
Good

Bridge Details

Structure #
19 0136L
Year Built
1971
Length
39.8 m (130.6 ft)
Max Span
8.5 m
Width
12.8 m (42 ft)
Lanes
2
Daily Traffic
35,000
Material
Concrete Continuous
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.