HEATHER GLEN over INTERSTATE 80

03-PLA-080-27.39 · County 061, California · Built 1966 · 2 Lanes · 641 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
19 0131
Year Built
1966
Length
62.2 m (204.1 ft)
Max Span
21 m
Width
11.4 m (37.4 ft)
Lanes
2
Daily Traffic
641
Material
Prestressed Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.