INTERSTATE 80 EB over HAMPSHIRE ROCKS S YUBA R

03-PLA-080-R64.54R · County 061, California · Built 1963 · 2 Lanes · 27,000 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
7
Good
Superstructure
5
Fair
Substructure
4
Poor

Bridge Details

Structure #
19 0121R
Year Built
1963
Length
125.9 m (413.1 ft)
Max Span
31.1 m
Width
14.2 m (46.6 ft)
Lanes
2
Daily Traffic
27,000
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$4,121,000
Total Project Cost
$6,924,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.