INTERSTATE 80 EB over BLUE CANYON ROAD
03-PLA-080-53.36 · County 061, California · Built 1959 · 2 Lanes · 13,500 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
4
Poor
Superstructure
4
Poor
Substructure
4
Poor
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 4 | Poor |
| Superstructure | 4 | Poor |
| Substructure | 4 | Poor |
Location
39.284219, -120.704081
This bridge is in worse condition than 95.4% of bridges in County 061. The average bridge in California is 0 years old; this one is 67 years old.
Nearby Bridges
INTERSTATE 80 WB over BLUE CANYON ROAD
Built 1959
INTERSTATE 80 EB over NYACK ROAD
Built 2009
INTERSTATE 80 WB over NYACK ROAD
Built 1959
INTERSTATE 80 over UP RR BNSF RY & AMTRAK
Built 1964
FDR 19 over N. FK. OF N. FK AMER RIV
Built 1949
INTERSTATE 80 over CARPENTER FLAT ROAD
Built 1963
FDR 18 over BEAR RIVER
Built 1984
FDR 20-17-04 over S. YUBA CANAL
Built 1972
STATE ROUTE 20 over BEAR RIVER
Built 1950
FDR 19-22-6 over N.FK.AMERICAN RIVER
Built 1935
Bridge Details
- Structure #
- 19 0115R
- Year Built
- 1959
- Reconstructed
- 1984
- Length
- 34.1 m (111.9 ft)
- Max Span
- 13.4 m
- Width
- 15.1 m (49.5 ft)
- Lanes
- 2
- Daily Traffic
- 13,500
- Material
- Concrete Continuous
- Design
- Tee Beam
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $515,000
- Total Project Cost
- $865,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.