FIFIELD ROAD over PLEASANT GROVE CRK CANAL

EAST OF NATOMAS ROAD · County 101, California · Built 2004 · 2 Lanes · 46 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
18C0136
Year Built
2004
Length
73.2 m (240.2 ft)
Max Span
12.2 m
Width
9.3 m (30.5 ft)
Lanes
2
Daily Traffic
46
Material
Concrete Continuous
Design
Slab
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.