COOLEY ROAD over SUTTER-BUTTE CANAL

0.6 MI E OF METTER RD · County 101, California · Built 1910 · 2 Lanes · 193 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
5
Fair
Superstructure
7
Good
Substructure
4
Poor

Bridge Details

Structure #
18C0101
Year Built
1910
Reconstructed
1974
Length
11.8 m (38.7 ft)
Max Span
5.7 m
Width
5.5 m (18 ft)
Lanes
2
Daily Traffic
193
Material
Concrete Continuous
Design
Tee Beam
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$149,000
Total Project Cost
$251,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.