INTERSTATE 80 over TRUCKEE RIVER

03-NEV-080-20.84 · County 057, California · Built 2004 · 4 Lanes · 28,000 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
8
Very Good
Substructure
6
Satisfactory

Bridge Details

Structure #
17 0013
Year Built
2004
Length
93 m (305.1 ft)
Max Span
35 m
Width
32.7 m (107.3 ft)
Lanes
4
Daily Traffic
28,000
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.