CHUCK YEAGER ROAD over VINEYARD CREEK

0.3 MI SW OF WALDO ROAD · County 115, California · Built 2013 · 2 Lanes · 500 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
7
Good

Bridge Details

Structure #
16C0106
Year Built
2013
Length
27.4 m (89.9 ft)
Max Span
11 m
Width
10.6 m (34.8 ft)
Lanes
2
Daily Traffic
500
Material
Concrete Continuous
Design
Slab
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.