SIMPSON LN over YUBA RIVER

0.5 MI SE/O E 10TH ST · County 115, California · Built 1957 · 2 Lanes · 11,630 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
4
Poor

Bridge Details

Structure #
16C0001
Year Built
1957
Reconstructed
1987
Length
127.1 m (417 ft)
Max Span
25.3 m
Width
13.3 m (43.6 ft)
Lanes
2
Daily Traffic
11,630
Material
Prestressed Concrete
Design
Tee Beam
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$1,690,000
Total Project Cost
$2,839,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.