E CAMP ROAD over SPRING CREEK

3.4 MI S OF S.R. 20 · County 011, California · Built 2012 · 2 Lanes · 307 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
15C0205
Year Built
2012
Length
15.3 m (50.2 ft)
Max Span
15.3 m
Width
9.8 m (32.2 ft)
Lanes
2
Daily Traffic
307
Material
Prestressed Concrete
Design
Slab
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.