PUTNUM WAY over SALT CREEK
1 MI N OF HILLGATE RD · County 011, California · Built 1967 · 2 Lanes · 421 vehicles/day
Overall
Deck
5
Fair
Superstructure
5
Fair
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 5 | Fair |
| Substructure | 7 | Good |
Location
39.028056, -122.064653
This bridge is in worse condition than 71.4% of bridges in County 011. The average bridge in California is 0 years old; this one is 59 years old.
Nearby Bridges
INTERSTATE 5 SB over SALT CREEK DR
Built 1967
INTERSTATE 5 NB over SALT CREEK
Built 1952
INTERSTATE 5 SB over SALT CREEK
Built 1967
INTERSTATE 5 NB over SALT CREEK DR
Built 1967
GAIL AVE (OLD 99W) over SALT CREEK
Built 1967
INTERSTATE 5 over SOUTH BRANCH SAND CREEK
Built 1967
HALL ST over INTERSTATE ROUTE 5
Built 1957
INTERSTATE 5 over HILLGATE ROAD
Built 1957
HILLGATE ROAD over SALT CREEK
Built 1965
ALMOND AVE over TEHAMA-COLUSA CANAL
Built 1976
Bridge Details
- Structure #
- 15C0033
- Year Built
- 1967
- Length
- 25 m (82 ft)
- Max Span
- 7 m
- Width
- 10.4 m (34.1 ft)
- Lanes
- 2
- Daily Traffic
- 421
- Material
- Concrete Continuous
- Design
- Slab
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.