INTERSTATE 5 over FUNK SLOUGH OVERFLOW
03-COL-005-R29.02 · County 011, California · Built 1971 · 2 Lanes · 12,500 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
39.309183, -122.189097
This bridge is in worse condition than 9.9% of bridges in County 011. The average bridge in California is 0 years old; this one is 55 years old.
Nearby Bridges
INTERSTATE 5 over FUNK SLOUGH OVERFLOW
Built 1971
OLD 99W over FUNKS CREEK OVERFLOW
Built 1915
INTERSTATE 5 SB over CNFR & OLD HWY 99W
Built 1971
INTERSTATE 5 NB over CNFR & OLD HWY 99W
Built 1971
OLD 99W over STONE CORRAL CREEK OVFL
Built 1915
INTERSTATE 5 SB over STONE CORRAL CREEK
Built 1971
INTERSTATE 5 NB over STONE CORRAL CREEK
Built 1971
OLD 99W over FUNKS CREEK
Built 1927
OLD 99W over STONE CORRAL CREEK
Built 1927
INTERSTATE 5 SB over FUNKS CREEK
Built 1970
Bridge Details
- Structure #
- 15 0077L
- Year Built
- 1971
- Length
- 38.1 m (125 ft)
- Max Span
- 7.9 m
- Width
- 12.5 m (41 ft)
- Lanes
- 2
- Daily Traffic
- 12,500
- Material
- Concrete Continuous
- Design
- Slab
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.