INTERSTATE 5 over NORTH BRANCH SAND CREEK
03-COL-005-R9.79 · County 011, California · Built 1967 · 2 Lanes · 15,000 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
39.051219, -122.080208
This bridge is in worse condition than 9.9% of bridges in County 011. The average bridge in California is 0 years old; this one is 59 years old.
Nearby Bridges
INTERSTATE 5 over NORTH BRANCH SAND CREEK
Built 1967
FIFTH ST (OLD 99W) over NORTH BRANCH SAND CREEK
Built 1951
FIFTH ST (OLD 99W) over ROSINA DRAW
Built 1951
HAHN ROAD over INTERSTATE 5
Built 1967
HAHN ROAD over NORTH BRANCH SAND CREEK
Built 1968
OLD 99W over NOBO DRAW
Built 1946
INTERSTATE 5 over SOUTH BRANCH SAND CREEK
Built 1967
GAIL AVE (OLD 99W) over SALT CREEK
Built 1967
INTERSTATE 5 SB over SALT CREEK
Built 1967
INTERSTATE 5 NB over SALT CREEK DR
Built 1967
Bridge Details
- Structure #
- 15 0007R
- Year Built
- 1967
- Length
- 19.8 m (65 ft)
- Max Span
- 7.9 m
- Width
- 12.5 m (41 ft)
- Lanes
- 2
- Daily Traffic
- 15,000
- Material
- Concrete Continuous
- Design
- Slab
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.