BIG CANYON RD over BIG CANYON CREEK

8 MI NORTH OF SR 29 · County 033, California · Built 1930 · 2 Lanes · 208 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
5
Fair

Bridge Details

Structure #
14C0116
Year Built
1930
Reconstructed
1995
Length
12.6 m (41.3 ft)
Max Span
12 m
Width
7.8 m (25.6 ft)
Lanes
2
Daily Traffic
208
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.