SALMON LAKE ROAD over CHURCH CREEK
WEST OF GOLD LAKE RD · County 091, California · Built 2023 · 2 Lanes · 125 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
39.653694, -120.632722
This bridge is in worse condition than 13.6% of bridges in County 091. The average bridge in California is 0 years old; this one is 3 years old.
Nearby Bridges
PACKER LAKE ROAD over SALMON CREEK
Built 1960
GOLD LAKE ROAD over HOWARD CREEK
Built 2008
STATE ROUTE 49 over HOWARD CREEK
Built 1964
NO DATA ENTERED over N. YUBA RIVER
Built 1978
STATE ROUTE 49 over SALMON CREEK
Built 1964
21N10 IN L.B. CG over GRAY EAGLE CK
Built 1995
ROAD 22N10 over GRAY EAGLE CREEK
Built 1977
WILD PLUM ROAD over NORTH FORK YUBA RIVER
Built 1963
FDR 524-01 over N. YUBA RIVER
Built 1963
SIERRA BUTTE ROAD over REIS RAVINE
Built 2005
Bridge Details
- Structure #
- 13C0062
- Year Built
- 2023
- Length
- 19.8 m (65 ft)
- Max Span
- 18.9 m
- Width
- 6.7 m (22 ft)
- Lanes
- 2
- Daily Traffic
- 125
- Material
- Prestressed Concrete
- Design
- Slab
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.