EAST 20TH STREET over LTL CHC-BUT CR DIV CHAN

0.35 MI E OF BRUCE ROAD · County 007, California · Built 2009 · 2 Lanes · 2,200 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
12C0429
Year Built
2009
Length
21.7 m (71.2 ft)
Max Span
20.9 m
Width
15.2 m (49.9 ft)
Lanes
2
Daily Traffic
2,200
Material
Prestressed Concrete
Design
Box Beam or Girders - Multiple
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.