BANGOR HWY over WEST BRANCH HONCUT CREEK
6.7 MI N LAPORTE RD · County 007, California · Built 1965 · 2 Lanes · 1,279 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 5 | Fair |
Location
39.467867, -121.457228
This bridge is in worse condition than 56.4% of bridges in County 007. The average bridge in California is 0 years old; this one is 61 years old.
Nearby Bridges
MINERS RANCH RD over HONCUT CREEK
Built 1954
BANGOR HWY over N FK HONCUT CREEK
Built 1920
FOOTHILL BLVD over SOUTH BRNCH WYMAN RAVINE
Built 1926
FOOTHILL BLVD over WYMAN RAVINE
Built 2015
BANGOR HWY over ROCKY HUNCUT CREEK
Built 1937
LOWER WYANDOTTE RD over BRANCH WYMAN RAVINE
Built 1940
SWEDES FLAT ROAD over ROCKY HONCUT CREEK
Built 1925
OPHIR RD EXT over BRANCH WYMAN RAVINE
Built 1988
LOWER WYANDOTTE RD over WYMAN RAVINE
Built 1972
UPPER PALERMO ROAD over BRANCH WYMAN RAVINE
Built 1975
Bridge Details
- Structure #
- 12C0294
- Year Built
- 1965
- Length
- 7.9 m (25.9 ft)
- Max Span
- 7.3 m
- Width
- 10 m (32.8 ft)
- Lanes
- 2
- Daily Traffic
- 1,279
- Material
- Concrete
- Design
- Slab
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.