OPENSHAW RD over DRY CREEK
0.15 MI N SHIPPEE RD · County 007, California · Built 1930 · 2 Lanes · 20 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
5
Fair
Superstructure
5
Fair
Substructure
4
Poor
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 5 | Fair |
| Substructure | 4 | Poor |
Location
39.607833, -121.671617
This bridge is in worse condition than 94.5% of bridges in County 007. The average bridge in California is 0 years old; this one is 96 years old.
Nearby Bridges
STATE ROUTE 149 NB over DRY CREEK
Built 1975
STATE ROUTE 149 SB over DRY CREEK
Built 2008
OPENSHAW RD over DRY CREEK OVERFLOW
Built 1922
OPENSHAW RD over DRY CREEK OVERFLOW
Built 1955
STATE ROUTE 149 NB over CLEAR CREEK
Built 1951
STATE ROUTE 149 SB over CLEAR CREEK
Built 2008
STATE ROUTE 99 over DRY CREEK
Built 1998
NB 149 TO SB 99 RP over SR 99 AND SR 149
Built 2008
STATE ROUTE 99 NB over STATE ROUTE 149
Built 2008
STATE ROUTE 99 over GOLDRUN CREEK
Built 1952
Bridge Details
- Structure #
- 12C0268
- Year Built
- 1930
- Reconstructed
- 1952
- Length
- 45.5 m (149.3 ft)
- Max Span
- 9.2 m
- Width
- 8.8 m (28.9 ft)
- Lanes
- 2
- Daily Traffic
- 20
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $929,000
- Total Project Cost
- $1,561,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.