PENTZ ROAD over BERRY CANYON
3.1 MI EAST OF SR 99 · County 007, California · Built 1970 · 2 Lanes · 7,146 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
4
Poor
Superstructure
4
Poor
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 4 | Poor |
| Superstructure | 4 | Poor |
| Substructure | 5 | Fair |
Location
39.640192, -121.663094
This bridge is in worse condition than 94.5% of bridges in County 007. The average bridge in California is 0 years old; this one is 56 years old.
Nearby Bridges
DURHAM-PENTZ RD over CLEAR CREEK
Built 1970
STATE ROUTE 191 over FALLAGER CREEK
Built 1999
PENTZ RD over WEST BRNCH LITTLE DRY CR
Built 1970
STATE ROUTE 191 over DRY CREEK
Built 1986
STATE ROUTE 149 NB over CLEAR CREEK
Built 1951
STATE ROUTE 99 NB over STATE ROUTE 149
Built 2008
STATE ROUTE 149 SB over CLEAR CREEK
Built 2008
NB 149 TO SB 99 RP over SR 99 AND SR 149
Built 2008
DURHAM-PENTZ RD over HAYES CANYON
Built 1970
OPENSHAW RD over DRY CREEK OVERFLOW
Built 1955
Bridge Details
- Structure #
- 12C0247
- Year Built
- 1970
- Length
- 21.9 m (71.9 ft)
- Max Span
- 8.5 m
- Width
- 9.9 m (32.5 ft)
- Lanes
- 2
- Daily Traffic
- 7,146
- Material
- Concrete Continuous
- Design
- Slab
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $218,000
- Total Project Cost
- $366,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.