PENTZ ROAD over BERRY CANYON

3.1 MI EAST OF SR 99 · County 007, California · Built 1970 · 2 Lanes · 7,146 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
4
Poor
Superstructure
4
Poor
Substructure
5
Fair

Bridge Details

Structure #
12C0247
Year Built
1970
Length
21.9 m (71.9 ft)
Max Span
8.5 m
Width
9.9 m (32.5 ft)
Lanes
2
Daily Traffic
7,146
Material
Concrete Continuous
Design
Slab
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$218,000
Total Project Cost
$366,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.