STATE ROUTE 70 over MILL CREEK

03-BUT-070-42.06 · County 007, California · Built 2021 · 2 Lanes · 1,700 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
12 0205
Year Built
2021
Length
27.4 m (89.9 ft)
Max Span
26.1 m
Width
14.6 m (47.9 ft)
Lanes
2
Daily Traffic
1,700
Material
Prestressed Concrete
Design
Girder and Floorbeam System
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.