STATE ROUTE 162 over CANYON CREEK
03-BUT-162-29.96 · County 007, California · Built 1967 · 2 Lanes · 1,500 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
7
Good
Superstructure
4
Poor
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 4 | Poor |
| Substructure | 5 | Fair |
Location
39.584892, -121.430017
This bridge is in worse condition than 94.5% of bridges in County 007. The average bridge in California is 0 years old; this one is 59 years old.
Nearby Bridges
STATE ROUTE 162 over MFK FEATHER RI BIDWELL
Built 1965
DWR ACCESS ROAD over OREGON GULCH
Built 2020
CRAIG ACCESS ROAD over OREGON GULCH
Built 2020
OROVILLE QUINCY HY over LAKE MADRONE SPILLWAY
Built 1930
OREGON GULCH RD over OREGON GULCH
Built 1920
CANYON DRIVE over CANYON DRIVE CREEK
Built 1971
OREGON GULCH RD over OREGON GULCH CREEK
Built 1983
LUMPKIN ROAD over SOUTH FORK FEATHER RIVER
Built 1967
OREGON GULCH ROAD over MORRIS RAVINE
Built 2017
CANYON HIGHLAND DR over OROVILLE DAM BLVD
Built 1930
Bridge Details
- Structure #
- 12 0184
- Year Built
- 1967
- Length
- 237.7 m (779.9 ft)
- Max Span
- 76.2 m
- Width
- 10.4 m (34.1 ft)
- Lanes
- 2
- Daily Traffic
- 1,500
- Material
- Steel Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- Other State Agencies
- Last Inspected
- N/A
- Est. Improvement
- $5,667,000
- Total Project Cost
- $9,520,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.