STATE ROUTE 99 NB over LITTLE DRY CREEK

03-BUT-099-22.95 · County 007, California · Built 1952 · 2 Lanes · 12,400 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
12 0075R
Year Built
1952
Length
28.3 m (92.8 ft)
Max Span
9.1 m
Width
13.4 m (44 ft)
Lanes
2
Daily Traffic
12,400
Material
Concrete Continuous
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.