ROAD #48 over BRANCH WALKER CREEK
0.85 MI EAST OF 99W · County 021, California · Built 1940 · 2 Lanes · 647 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
7
Good
Superstructure
4
Poor
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 4 | Poor |
| Substructure | 5 | Fair |
Location
39.538875, -122.173928
This bridge is in worse condition than 93.3% of bridges in County 021. The average bridge in California is 0 years old; this one is 86 years old.
Nearby Bridges
ROAD 48 over GLENN-COLUSA CANAL
Built 1948
ROAD 48 over WALKER CREEK
Built 1974
ROAD 48 over WILLOW CREEK
Built 1945
ROAD 46 over WALKER CREEK
Built 1989
ROAD KK over WILLOW CREEK
Built 1940
STATE ROUTE 162 over WILLOW CREEK
Built 1960
COUNTY ROAD 99W over WILLOW CREEK OVERFLOW
Built 1937
STATE ROUTE 162 over WALKER CREEK
Built 1942
STATE ROUTE 162 over CENTRAL IRRIGATION CANAL
Built 1925
CO RD #99 W over WILLOW CREEK
Built 1915
Bridge Details
- Structure #
- 11C0261
- Year Built
- 1940
- Reconstructed
- 1955
- Length
- 8.5 m (27.9 ft)
- Max Span
- 7.9 m
- Width
- 9.1 m (29.9 ft)
- Lanes
- 2
- Daily Traffic
- 647
- Material
- Concrete
- Design
- Girder and Floorbeam System
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $179,000
- Total Project Cost
- $301,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.