INTERSTATE 5 NB over HAMBRIGHT CREEK

03-GLE-005-R26.46 · County 021, California · Built 1966 · 2 Lanes · 12,300 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
11 0071R
Year Built
1966
Length
49.1 m (161.1 ft)
Max Span
16.8 m
Width
12.7 m (41.7 ft)
Lanes
2
Daily Traffic
12,300
Material
Concrete Continuous
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.