STATE ROUTE 162 over PRINCETON-CODORA CANAL

03-GLE-162-76.25 · County 021, California · Built 1963 · 2 Lanes · 2,600 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
7
Good

Bridge Details

Structure #
11 0035
Year Built
1963
Length
10.5 m (34.4 ft)
Max Span
4.9 m
Width
12.3 m (40.4 ft)
Lanes
2
Daily Traffic
2,600
Material
Concrete Continuous
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.