EAST HILL ROAD over DAVIS CREEK

1.2 MI EAST OF HILLTOP DR · County 045, California · Built 2019 · 2 Lanes · 2,000 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
10C0222
Year Built
2019
Length
56.2 m (184.4 ft)
Max Span
54.4 m
Width
13.3 m (43.6 ft)
Lanes
2
Daily Traffic
2,000
Material
Prestressed Concrete
Design
Box Beam or Girders - Multiple
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.